Inspection Procedure 27: Purge Control Solenoid Valve System





OPERATION




FUNCTION




PROBABLE CAUSE




DIAGNOSIS PROCEDURE


STEP 1. M.U.T.-III actuator test



  • Item 08: Purge control solenoid valve
OK: Operating sound can be heard and the valve vibrates

Q. Is the check result normal?

Intermittent malfunction (Refer to GROUP 00 - How to Use Troubleshooting/Inspection Service Points ).
Go to Step 2 .

STEP 2. Connector check: B-01 purge control solenoid valve connector



Q. Is the check result normal?

Go to Step 3 .

Repair or replace.

STEP 3. Check purge control solenoid valve itself.



  • Check purge control solenoid valve itself [Refer to GROUP 17 - Emission Control System - Evaporative Emission Control System - Purge Control Solenoid Valve Check ]

Q. Is the check result normal?

Go to Step 4 .
Replace purge control solenoid valve.

STEP 4. Perform voltage measurement at B-01 purge control solenoid valve connector.




  • Disconnect connector, and measure at harness side.
  • Ignition switch: ON
  • Voltage between terminal No. 2 and earth.
OK: System voltage

Q. Is the check result normal?

Go to Step 6 .

Go to Step 5 .

STEP 5. Connector check: B-15X engine control relay connector.




Q. Is the check result normal?


    Check intermediate connector C-116, and repair if necessary. If intermediate connector is normal, check and repair harness between B-01 (terminal No. 2) purge control solenoid valve connector and B-15X (terminal No. 1) engine control relay connector.

    • Check power line for open/short circuit.

Repair or replace.

STEP 6. Connector check: C-110 engine-A/T-ECU connector



Q. Is the check result normal?

Go to Step 7 .

Repair or replace.

STEP 7. Perform voltage measurement at C-110 engine-A/T-ECU connector.





  • Disconnect connector, and measure at harness side.
  • Ignition switch: ON
  • Voltage between terminal No. 23 and earth.
OK: System voltage

Q. Is the check result normal?

Go to Step 8 .


    Check and repair harness between B-01 (terminal No. 1) purge control solenoid valve connector and C-110 (terminal No. 23) engine-A/T-ECU connector.

    • Check output line for open circuit.

STEP 8. Check harness between B-01 (terminal No. 1) purge control solenoid valve connector and C-110 (terminal No. 23) engine-A/T-ECU connector.





  • Check earthing line for damage.

Q. Is the check result normal?

Go to Step 9 .

Repair.

STEP 9. Check harness between B-01 (terminal No. 2) purge control solenoid valve connector and B-15X (terminal No. 1) engine control relay connector.





  • Check power supply line for damage.

Q. Is the check result normal?

Go to Step 10 .

Repair.

STEP 10. M.U.T.-III actuator test



  • Item 08: purge control solenoid valve
OK: Operating sound can be heard and the valve vibrates.

Q. Is the check result normal?

Intermittent malfunction (Refer to GROUP 00 - How to Use Troubleshooting/Inspection Service Points ).
Replace engine-A/T-ECU.