PURGE CONTROL SOLENOID VALVE CHECK



note When removing the vacuum hose, always make a mark so that it can be reconnected at original position.
1.Remove vacuum hoses from the purge control solenoid valve.
2.Disconnect the purge control solenoid valve connector.

3.Connect a hand vacuum pump to nipple (A) of the solenoid valve (refer to the illustration at left).
4.Check airtightness by applying vacuum with voltage applied directly from the battery to the solenoid valve and without applying voltage.
Battery voltage
State of nipple B
Normal condition
Applied

opened
vacuum leaks
plugged
vacuum maintained
Not applied
opened
vacuum maintained

5.Measure the resistance between the terminals of the solenoid valve.
Standard value: 30 - 34 Ω (at 20°C)