REMOVAL AND INSTALLATION







Defroster nozzle, and ventilator air distribution duct removal steps


·
Instrument panel removal and Installation (Refer to GROUP 52A, Instrument panel ).


1.
Defroster nozzle


2.
Ventilator air distribution duct



Foot duct removal steps


3.
Foot duct A


4.
Foot duct B