REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Room Under Cover Front A, B Removal (Refer to GROUP 51 - Under Cover).

Post-installation Operation
  • Engine Room Under Cover Front A, B Installation (Refer to GROUP 51 - Under Cover).





Removal steps


1.
Heat protector


2.
Engine oil pressure switch connector connection
<<A>>
>>A<<
3.
Engine oil pressure switch

REMOVAL SERVICE POINT



<<A>> ENGINE OIL PRESSURE SWITCH REMOVAL



Use special tool oil pressure switch wrench (MB992118) to remove the engine oil pressure switch.

INSTALLATION SERVICE POINT



>>A<< ENGINE OIL PRESSURE SWITCH INSTALLATION



1.Apply sealant to the engine oil pressure switch thread.
Specified sealant: ThreeBond 1141J or equivalent
note Install the engine oil pressure switch immediately after applying sealant.

2.
caution After the installation, until a sufficient period of time (one hour or more) elapses, do not apply the oil or water to the sealant application area or start the engine.
In the same manner as removal, use special tool oil pressure switch wrench (MB992118) to tighten the engine oil pressure switch to the specified torque.
Tightening torque: 10 ± 2 N·m