REMOVAL AND INSTALLATION <LHD>



MASTER CYLINDER AND BRAKE BOOSTER <4N1>


The following items should be added as pre-removal and post-installation operations.
The removal and installation service points are the same as before.
Pre-removal and Post-installation operation

VACUUM HOSE AND VACUUM PIPE <4N1>






Removal steps

>>A<<
1.
Vacuum hose


2.
Hose clip

>>A<<
3.
Vacuum hose


4.
Hose clip

>>A<<
5.
Vacuum pipe


6.
Clamp

INSTALLATION SERVICE POINTS



>>A<< VACUUM HOSE INSTALLATION



Align the mark as shown in the figure to assemble the vacuum hose.