Code No. P0175: Left Bank Abnormal Fuel System (Rich) <Vehicles except for Brazil>








OPERATION




FUNCTION




TROUBLE JUDGMENT


Check Conditions
Judgment Criterion
or

Check Conditions
Judgment Criterion
or

Check Conditions
Judgment Criterion
or


PROBABLE CAUSES




DIAGNOSIS PROCEDURE


STEP 1. M.U.T.-III data list



  • Refer to Data List Reference Table .

    1. Item 05: Intake air temperature sensor
    2. Item 06: Engine coolant temperature sensor
    3. Item 08: Manifold absolute pressure sensor
    4. Item 10: Air flow sensor

Q. Are the check results normal?

Go to Step 2 .
Perform the diagnosis code classified check procedure for the sensor that has shown an abnormal data value (Refer to Inspection Chart for Diagnosis Code ).

STEP 2. M.U.T.-III data list



  • Refer to Data List Reference Table .

    1. Item BB: Barometric pressure sensor

Q. Is the check result normal?

Go to Step 3 .
Replace the engine-ECU <M/T> or engine-A/T-ECU <A/T>.

STEP 3. Connector check: B-06 injector intermediate connector.


Q. Is the check result normal?

Go to Step 4 .
Repair or replace the connector.

STEP 4. Perform resistance measurement at B-06 injector intermediate connector.



  • Disconnect connector, and measure at harness side.

    1. Resistance between terminal No. 7 and No. 8 (No. 2 injector).
    2. Resistance between terminal No. 7 and No. 9 (No. 4 injector).
    3. Resistance between terminal No. 7 and No. 10 (No. 6 injector).
OK: 10.5 - 13.5 (at 20°C)

Q. Is the check result normal?

Go to Step 6 .
Go to Step 5 .

STEP 5. Check No. 2, No. 4 and No. 6 injector itself.



  • Check No. 2, No. 4 and No. 6 Injector itself (Refer to ).

Q. Is the check result normal?


    Check and repair harness between injector intermediate connector and injector connector.

    1. Check and repair harness between B-06 (terminal No. 8) injector intermediate connector and B-111 (terminal No. 2) No. 2 injector connector
    2. Check and repair harness between B-06 (terminal No. 9) injector intermediate connector and B-105 (terminal No. 2) No. 4 injector connector
    3. Check and repair harness between B-06 (terminal No. 10) injector intermediate connector and B-104 (terminal No. 2) No. 6 injector connector

    • Check output line for damage.
Replace the injector.

STEP 6. Fuel pressure measurement.



  • Fuel pressure measurement (Refer to Fuel Pressure Test ).

Q. Is the check result normal?

Go to Step 7 .
Repair.

STEP 7. Replace the B-104, B-105 and B-111 injector.



  • After replacing the injector, re-check the trouble symptoms.

Q. Is the check result normal?

Check end.
Replace the engine-ECU <M/T> or engine-A/T-ECU <A/T>.