REMOVAL AND INSTALLATION <4M41>



Pre-removal Operation
  • Engine Cover and Fuel Cover Removal (Refer to GROUP 11G - Engine Assembly ).
  • Throttle Body Removal (Refer to GROUP 13D - Throttle Body ).
  • EGR Valve and EGR Pipe Removal (Refer to GROUP 17 - Emission Control, EGR Valve and EGR Cooler ).

Post-installation Operation
  • EGR Valve and EGR Pipe Installation (Refer to GROUP 17 - Emission Control, EGR Valve and EGR Cooler ).
  • Throttle Body Installation (Refer to GROUP 13D - Throttle Body ).
  • Engine Cover and Fuel Cover Installation (Refer to GROUP 11G - Engine Assembly ).





Removal steps


1.
Control wiring harness connection


2.
Vacuum hose


3.
Vacuum pipe assembly


4.
Fuel return B pipe assembly


5.
No.2 intake air temperature sensor


6.
Gasket


7.
Harness bracket


8.
Engine cover B bracket


9.
Air inlet pipe


10.
Gasket


11.
Harness bracket


12.
Harness bracket


·
Fuel supply pump pipe assembly, fuel injection pipe assembly, common rail assembly, fuel pipe bracket (Refer to GROUP 13D - Fuel Injector and Common Rail ).


13.
Spring


14.
Retainer


15.
Inlet manifold assembly


16.
Inlet manifold gasket