Pre-removal
Operation
- Engine Cover and Fuel Cover Removal (Refer to GROUP
11G - Engine Assembly ).
- Throttle Body Removal (Refer to GROUP 13D -
Throttle Body ).
- EGR Valve and EGR Pipe Removal (Refer to GROUP 17
- Emission Control, EGR Valve and EGR Cooler
).
|
Post-installation
Operation
- EGR Valve and EGR Pipe Installation (Refer to GROUP
17 - Emission Control, EGR Valve and EGR
Cooler ).
- Throttle Body Installation (Refer to GROUP 13D
- Throttle Body ).
- Engine Cover and Fuel Cover Installation (Refer to
GROUP 11G - Engine Assembly ).
|