REMOVAL AND INSTALLATION <6G75>



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Cover Removal (Refer to GROUP 11C - Engine Assembly ).
  • Air Intake Hose Removal <6G7> (Refer to GROUP 15 - Air Cleaner ).

Post-installation Operation
  • Air Intake Hose Installation <6G7> (Refer to GROUP 15 - Air Cleaner ).
  • Engine Cover Installation (Refer to GROUP 11C - Engine Assembly ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).





Removal steps


1.
EGR valve connector


2.
Water hose


3.
Water hose


4.
EGR valve

>>A<<
5.
EGR valve gasket

INSTALLATION SERVICE POINT



>>A<< EGR VALVE GASKET INSTALLATION



Install the EGR valve gasket as shown in the illustration.