REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Cover Removal (Refer to GROUP 11G - Engine Assembly ).

Post-installation Operation
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Cover Installation (Refer to GROUP 11G - Engine Assembly ).





Removal steps


1.
EGR pipe B assembly

>>B<<
2.
EGR pipe gasket

>>B<<
3.
EGR pipe gasket


4.
EGR pipe bracket


5.
EGR valve connector


6.
EGR valve

>>B<<
7.
EGR valve gasket


8.
EGR pipe cover


9.
EGR pipe assembly


10.
EGR gasket

>>A<<
11.
EGR gasket


12.
EGR water inlet hose connection


13.
EGR water outlet hose connection


14.
EGR cooler assembly


15.
Vacuum hose connection


16.
Vacuum hose connection


17.
Vacuum pipe assembly


·
Turbocharger assembly and exhaust manifold assembly (Refer to GROUP 15 - Exhaust Manifold and Turbocharger Assembly ).


18.
EGR cooler bracket

INSTALLATION SERVICE POINTS



>>A<< EGR GASKET INSTALLATION



The projection on the EGR gasket should be position as shown.

>>B<< EGR VALVE GASKET/EGR PIPE GASKET INSTALLATION



The projection on the EGR valve gasket and EGR pipe gasket should be position as shown.