REMOVAL AND INSTALLATION



Pre-removal and Post-installation Operation
  • Under Skid Plate, Engine Room Under Cover Front and Engine Room Under Cover Rear Removal and Installation (Refer to GROUP 51 - Under Cover ).
  • A/T Fluid Draining and Refilling (Refer to ).
  • Front exhaust pipe R.H. (Catalytic converter assembly R.H.) Removal and Installation(Refer to GROUP 15 - Exhaust Pipe, Main Muffler and Catalytic Converter <6G72>, <6G75> or <4M40>, <4M41>).
  • Radiator Assembly Removal and Installation (Refer to GROUP 14 - Radiator ).






A/T fluid cooler removal steps


1.
Hose


2.
Bushing


3.
Distance piece


4.
A/T fluid return pipe


5.
Hose


·
Radiator grille (Refer to GROUP 51 - Radiator Grille ).


6.
Bushing


7.
Distance piece


8.
A/T fluid cooler bracket


9.
Bushing


10.
Distance piece


11.
A/T fluid cooler bracket


12.
A/T fluid cooler



A/T fluid cooler tube assembly removal steps

>>B<<
13.
Eye bolt

>>B<<
14.
A/T fluid cooler pipe assembly

>>B<<
15.
A/T fluid cooler pipe bracket

>>A<<
16.
Return hose

>>A<<
17.
Feed hose


18.
Hose


19
Hose


20.
A/T fluid cooler pipe assembly

INSTALLATION SERVICE POINTS



>>A<< FEED HOSE/RETURN HOSE INSTALLATION



Install the feed hose and return hose so that the markings are positioned as shown in the illustration.

>>B<< A/T FLUID COOLER PIPE BRACKET/A/T FLUID COOLER PIPE ASSEMBLY/EYE BOLT INSTALLATION


Provisionally tighten the eye bolts onto the transmission and provisionally secure the pipes with the clamps, and then fully tighten the eye bolts. Furthermore, tighten the clamps in order starting from the one closest to the transmission.