REMOVAL AND INSTALLATION



Pre-removal Operation
  • Centre Lower Panel Removal (Refer to GROUP 52A, Floor Console ).

Post-installation Operation
  • Centre Lower Panel Installation (Refer to GROUP 52A, Floor Console ).
  • HBB buzzer operation check (Refer to ).





Removal steps


1.
HBB buzzer connector


2.
HBB buzzer