INSPECTION




OIL JET / CHECK VALVE



The inspection procedure for this oil jet is the same as for the conventional oil jet.

CRANKSHAFT OIL CLEARANCE (PLASTIGAGE METHOD)


The crankshaft oil clearance can be measured easily by using a plastigage, as follows.

1.Remove oil and grease and any other foreign matters from crankshaft journal and bearing inner surface.
2.Install the crankshaft.
3.Cut the plastigage to the same length as the width of bearing and place it on journal in parallel with its axis.
4.Gently place the crankshaft bearing cap over it and tighten the bolts to the specified torque.
5.Remove the bolts and gently remove the crankshaft bearing cap.

6.Measure the width of the smashed plastigage at its widest section by using a scale printed on the plastigage bag.
Standard value: 0.020 - 0.038 mm
Limit: 0.1 mm

CYLINDER BLOCK



1.Using a straightedge and thickness gauge, check the block top surface for warpage. Make sure that the surface is free from gasket chips and other objects.
Standard value: 0.05 mm
Limit: 0.1 mm
2.If the distortion is excessive, replace the cylinder block.

3.Check cylinder walls for scratches and size. If defects are evident, replace the cylinder block.
4.Using cylinder gauge, measure the cylinder bore, and cylindricity. If worn badly, replace the cylinder block. Measurement points are shown in illustration.
Standard value:
    Cylinder inner diameter 91.10 - 91.13 mm
    Cylindricity 0.02 mm or less