REMOVAL AND INSTALLATION <4D5>



Pre-removal Operation
  • Under Skid Plate and Engine Room Under Cover Front Removal.
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change ).
  • Engine Oil Draining (Refer to ).
  • Alternator Removal (Refer to GROUP 16 - Charging System, Alternator ).

Post-installation Operation
  • Alternator Installation (Refer to GROUP 16 - Charging System, Alternator ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change ).
  • Engine Oil Refilling (Refer to ).
  • Under Skid Plate and Engine Room Under Cover Front Installation.





Removal steps


1.
Water hose connection


2.
Water hose connection


3.
O-ring

>>A<<
4.
Engine oil cooler


5.
Gasket

INSTALLATION SERVICE POINT



>>A<< ENGINE OIL COOLER INSTALLATION



Position the tab as shown in the illustration.