REMOVAL AND INSTALLATION <4D5>



Pre-removal Operation
  • Timing Belt and Timing Belt B Removal (Refer to GROUP 11G - Timing Belt ).
  • Thermostat Removal (Refer to ).

Post-installation Operation
  • Thermostat Installation (Refer to ).
  • Timing Belt and Timing Belt B Installation (Refer to GROUP 11G - Timing Belt ).





Removal steps


1.
Plate


2.
Gasket


·
Oil hose and oil pipe (Refer to GROUP 11G - Vacuum Pump ).


3.
Water pump


4.
Water pump gasket

>>A<<
5.
O-ring

INSTALLATION SERVICE POINT



>>A<< O-RING INSTALLATION


caution
  • Care must be taken not to permit engine oil or other greases to adhere to the O-ring.
  • When inserting the water pipe, check to be sure that there is no sand, dirt, etc. on its inner surface.

Fit the O-ring to the groove in the water pipe. Then lubricate the rim of O-ring or the inside of water pipe fixing position with water, and then insert the water pipe to the water pump.