REMOVAL AND INSTALLATION <4G6>



Pre-removal Operation
  • Under Skid Plate and Engine Room Under Cover Front Removal (Refer to GROUP 51 - Under Cover ).
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Throttle Body Removal (Refer to GROUP 13A - Throttle Body ).
  • Fuel Delivery Pipe and Fuel Injector Assembly Removal (Refer to GROUP 13A - Injector ).

Post-installation Operation
  • Fuel Delivery Pipe and Fuel Injector Assembly Installation (Refer to GROUP 13A - Injector ).
  • Throttle Body Installation (Refer to GROUP 13A - Throttle Body ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Under Skid Plate and Engine Room Under Cover Front Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Manifold absolute pressure sensor


2.
O-ring


3.
Purge control solenoid valve


4.
O-ring


5.
Inlet manifold cover


6.
EGR valve gasket


·
Radiator upper hose connection (Refer to GROUP 14 - Radiator ).


·
Heater piping hose connection (Refer to GROUP 55A - Heater Hose ).


7.
Water outlet fitting


8.
Inlet manifold stay


9.
Inlet manifold assembly


10.
Inlet manifold gasket