REMOVAL AND INSTALLATION <4D5>



Pre-removal Operation
  • Vacuum Hose Removal (Refer to GROUP 11H - Solenoid Valve and Vacuum Hose ).
  • Throttle Body Removal (Refer to GROUP 13E - Throttle Body ).
  • EGR Valve and EGR Pipe Removal (Refer to GROUP 17 - Emission Control, EGR Valve and EGR Cooler ).

Post-installation Operation
  • EGR Valve and EGR Pipe Installation (Refer to GROUP 17 - Emission Control, EGR Valve and EGR Cooler ).
  • Throttle Body Installation (Refer to GROUP 13E - Throttle Body ).
  • Vacuum Hose Installation (Refer to GROUP 11H - Solenoid Valve and Vacuum Hose ).





Removal steps


·
Control wiring harness connection


1.
Intake air temperature sensor


2.
Gasket


3.
Vacuum pipe B


4.
Vacuum pipe A


5.
Engine cover stay A


6.
Fuel inlet pipe mounting bolt


7.
Inlet manifold stay


·
Fuel injection pipe No.3, 4 clamp mounting bolt (Refer to GROUP 13E - Common Rail and Supply Pump ).

>>B<<
8.
Inlet manifold


9.
Helical gasket

>>A<<
10.
Tangential gasket


11.
Engine hanger

INSTALLATION SERVICE POINTS



>>A<< TANGENTIAL GASKET INSTALLATION



Position the projection as shown in the illustration.

>>B<< INLET MANIFOLD INSTALLATION



1.As shown in the illustration, temporarily tighten to 6.5 ± 1.5 N·m the bolts located at side A.
2.As shown in the illustration, tighten the bolts and nuts located at side B to the specified torque.
Tightening torque:
    Bolt: 24 ± 3 N·m
    Nut: 20 ± 2 N·m
3.As shown in the illustration, tighten the bolts located at side A to the specified torque.
Tightening torque: 24 ± 3 N·m