REMOVAL AND INSTALLATION



Pre-removal and Post-installation Operations
  • Transfer Oil Draining and Refilling (Refer to ).
  • Front and Rear Propeller Shaft Removal and Installation (Refer to GROUP 25 - Propeller Shaft ).





Removal steps


1.
Transfer harness connector connection


2.
Air breather hose


3.
Bracket


4.
Under guard
<<A>>
>>A<<
5.
Transfer assembly

REMOVAL SERVICE POINTS



<<A>> TRANSFER ASSEMBLY REMOVAL


1.
caution Pay attention so that the engine assembly does not interfere with the dash panel.
Remove the chassis frame crossmember and rear engine support insulator (Refer to GROUP 32 - Rear Engine Mounting ).
2.Support the transfer assembly with a transmission jack.
3.Lower the transfer assembly to allow sufficient clearance to remove the transfer assembly.

INSTALLATION SERVICE POINT



>>A<< TRANSFER ASSEMBLY INSTALLATION



The length of the transfer mounting bolt marked by the arrow measures 55 mm. The length of the remaining bolts measures 40 mm.