REMOVAL AND INSTALLATION



Pre-removal and Post-installation OperationEngine coolant replacement (Refer to GROUP 14 - On-vehicle Service).

<EXCEPT COOLER>



Removal steps
<<A>>
>>A<<
1.
Heater piping hose A
<<A>>
>>A<<
2.
Heater piping hose B

<COOLER>



Removal
<<A>>
>>A<<
1.
Heater piping hose

REMOVAL SERVICE POINTS


The removal service points are the same as before.

INSTALLATION SERVICE POINT


The installation service points are the same as before.