REMOVAL AND INSTALLATION



Pre-removal and Post-installation OperationEngine coolant replacement (Refer to GROUP 14 - On-vehicle Service).

<6B3 (L.H.drive vehicles)>



Removal steps
<<A>>
>>A<<
1.
Heater piping hose A
<<A>>
>>A<<
2.
Heater piping hose B
<<A>>
>>A<<
3.
Heater water pipe A
<<A>>
>>A<<
4.
Heater water pipe B

REMOVAL SERVICE POINT


The removal service points are the same as before.

INSTALLATION SERVICE POINT


The installation service points are the same as before.