REMOVAL AND INSTALLATION <VEHICLES WITH REAR COOLER (FRONT SIDE)>



Pre-removal and Post-installation OperationRefrigerant draining and refilling.
<4D5>


<4N1>



Dual pressure switch removal steps


·
Air duct (Refer to GROUP 15 - Air Cleaner). <4D5>


·
Air intake hose (Refer to GROUP 15 - Air Cleaner). <4N1>


1.
Dual pressure switch



A/C refrigerant hose and pipe removal steps
<<A>>

2.
A/C compressor suction pipe B connection
<<A>>

3.
A/C compressor suction pipe A


·
Headlamp assembly (Refer to GROUP 54A - Headlamp). <M/T>
<<A>>

4.
A/C condenser outlet pipe B connection
<<A>>

5.
A/C condenser outlet pipe A
<<A>>

6.
A/C condenser outlet pipe <A/T>


·
Cooling fan and cooling fan clutch assembly (Refer to GROUP 14 - Radiator Fan <4D5>, <4N1>).
<<A>>

7.
A/C compressor suction hose
<<A>>

8.
A/C compressor discharge hose


9.
O-ring

REMOVAL SERVICE POINT


The removal service points are the same as before.