REMOVAL AND INSTALLATION <4N1 VEHICLES WITH REAR COOLER AND IHX (FRONT SIDE)>



Pre-removal and Post-installation OperationRefrigerant draining and refilling.




Dual pressure switch removal step


·
Air intake hose (Refer to GROUP 15 - Air Cleaner).


1.
Dual pressure switch



A/C refrigerant hose and pipe removal steps
<<A>>

2.
A/C compressor suction pipe B connection
<<A>>

3.
A/C compressor outlet pipe B connection
<<A>>

4.
A/C pipe assembly
<<A>>

5.
A/C condenser outlet pipe


·
Cooling fan and cooling fan clutch assembly (Refer to GROUP 14 - Radiator Fan).


·
Radiator shroud assembly (Refer to GROUP 14 - Radiator).
<<A>>

6.
A/C compressor suction hose
<<A>>

7.
A/C compressor discharge hose


8.
O-ring

REMOVAL SERVICE POINT


The removal service points are the same as the removal service points for other vehicles.