REMOVAL AND INSTALLATION



Pre-removal Operation
  • Discharging refrigerant.
  • Discharging engine coolant (Refer to GROUP 14 - On-vehicle Service).

Post-installation Operation
  • Charging engine coolant (Refer to GROUP 14 - On-vehicle Service).
  • Charging refrigerant.






Removal steps


1.
Heater piping hose connection <Except cooler>
<<A>>

2.
A/C condenser outlet pipe A connection
<<A>>

3.
A/C compressor suction pipe connection


4.
O-ring


5.
A/C evaporator drain hose


·
Front deck crossmember (Refer to GROUP 52A - Instrument Panel)


6.
Heater assembly

REMOVAL SERVICE POINTS


The removal service points are the same as before.