REMOVAL AND INSTALLATION <FRONT SIDE>



Pre-removal and Post-installation OperationInstrument panel assembly removal and installation (Refer to GROUP 52A - Instrument Panel ).




Removal steps


1.
Defroster nozzle


2.
Ventilation air distribution duct


3.
Foot heater duct