REMOVAL AND INSTALLATION <4G6>



Pre-removal Operation
  • Drive Belt Removal (Refer to GROUP 11A - Crankshaft Pulley ).
  • Timing Belt Removal (Refer to GROUP 11A - Timing Belt ).

Post-installation Operation
  • Timing Belt Installation (Refer to GROUP 11A - Timing Belt ).
  • Drive Belt Installation (Refer to GROUP 11A - Crankshaft Pulley ).
  • Drive Belt Tension Check and Adjustment (Refer to GROUP 11A - On-vehicle Service, Drive Belt Tension Check and Adjustment ).





Removal steps


1.
Bracket


2.
Crank angle sensor