REMOVAL AND INSTALLATION <4D5>



Pre-removal Operation
  • Under Skid Plate and Engine Room Under Cover Removal (Refer to GROUP 51 - Under Cover ).
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Battery and Battery Box Removal (Refer to GROUP 54A - Battery ).

Post-installation Operation
  • Battery and Battery Box Installation (Refer to GROUP 54A - Battery ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Under Skid Plate and Engine Room Under Cover Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Engine upper cover <vehicles with intercooler>


2.
Wiring harness connection


3.
Engine oil level gauge and guide assembly


4.
O-ring


5.
EGR valve

>>B<<
6.
EGR valve gasket


7.
EGR pipe gasket


8.
EGR pipe B


9.
EGR pipe gasket


10.
EGR pipe A

>>A<<
11.
EGR pipe gasket


12.
EGR pipe gasket


13.
Water hose


14.
Heater piping hose connection


15.
EGR cooler


16.
EGR cooler bracket

INSTALLATION SERVICE POINTS



>>A<< EGR PIPE GASKET INSTALLATION



The projection on the EGR pipe gasket should be position as shown.

>>B<< EGR VALVE GASKET INSTALLATION



The projection on the EGR valve gasket should be position as shown.