REMOVAL AND INSTALLATION



Pre-removal and Post-installation OperationCentre upper panel assembly removal and installation (Refer to GROUP 52A - Instrument centre panel ).




Removal steps


1.
Aspirator hose


2.
Interior temperature sensor