REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Coolant Draining (Refer to ).
  • Timing Belt Removal (Refer to GROUP 11A, Timing Belt ).

Post-installation Operation
  • Timing Belt Installation (Refer to GROUP 11A, Timing Belt ).
  • Engine Coolant Refilling (Refer to ).





Removal steps


1.
Water pump


2.
Water pump gasket

>>A<<
3.
O-ring

INSTALLATION SERVICE POINT



>>A<< O-RING INSTALLATION



Fit the O-ring to the groove in the water inlet pipe. Then lubricate the O-ring and the inside of the water pump with water, and then insert the pipe to the water pump.