REMOVAL SERVICE POINT |
<<A>> SET NO.1 CYLINDER TO TDC OF ITS COMPRESSION STROKE. |
|
Turn the crankshaft clockwise,
align each timing mark to set No.1 cylinder to TDC (top
dead centre) of its compression stroke. |
INSTALLATION SERVICE POINT |
>>A<< FUEL INJECTION PUMP, FLANGE PLATE AND FUEL INJECTION PUMP GEAR ASSEMBLY INSTALLATION |
Turn the crankshaft clockwise,
align each timing mark to set No.1 cylinder to TDC (top
dead centre) of its compression stroke. |
1.Install the front plate
after mating marks on the fuel injection pump gear and the
flange
plate so that the fuel injection pump gear cannot be
rotated. It’s installed in front
plate so that fuel injection pump gear doesn’t revolve
together with a match mark of
fuel injection pump gear and flange plate. |