REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Cover Removal (Refer to GROUP 11G - Engine Assembly ).
  • Intercooler Outlet Air Hose Removal (Refer to GROUP 15 - Intercooler ).

Post-installation Operation
  • Intercooler Outlet Air Hose Installation (Refer to GROUP 15 - Intercooler ).
  • Engine Cover Installation (Refer to GROUP 11G - Engine Assembly ).





Removal steps


1.
Harness clamp


2.
Electronic - controlled throttle valve connector


3.
Bracket


4.
Throttle body assembly

>>A<<
5.
Throttle body gasket

INSTALLATION SERVICE POINTS



>>A<< THROTTLE BODY GASKET INSTALLATION


caution Poor idling etc. may result if the throttle body gasket is installed incorrectly.

Install the throttle body gasket as its protrusion is in the direction shown.