REMOVAL AND INSTALLATION







Removal steps

>>E<<
1.
Connecting rod cap nut
<<A>>
>>E<<
2.
Connecting rod cap


3.
Connecting rod bearing
<<B>>
>>D<<
4.
Piston and connecting rod assembly


5.
Connecting rod bearing

>>C<<
6.
Piston ring No. 1

>>C<<
7.
Piston ring No. 2

>>B<<
8.
Oil ring

>>A<<
9.
Snap ring

>>A<<
10.
Piston pin

>>A<<
11.
Piston

>>A<<
12.
Snap ring


13.
Connecting rod bolt

>>A<<
14.
Connecting rod

REMOVAL SERVICE POINTS



<<A>> CONNECTING ROD CAP REMOVAL



Mark the cylinder number on the side of the connecting rod big end for correct reassembly.

<<B>> PISTON AND CONNECTING ROD ASSEMBLY REMOVAL



1.Not to damage the crank pin, attach special tool bolt guide (MB992010), to the connecting rod bolt.
2.Remove the piston and connecting rod assembly from the cylinder block.

INSTALLATION SERVICE POINTS



>>A<< CONNECTING ROD / SNAP RING / PISTON / PISTON PIN INSTALLATION



1.When replacing the piston pin, read off the cylinder bore size mark on the cylinder block as illustrated, and select a piston according to the following table.
Cylinder bore size
Piston size mark
A
A
B
None
C
C
note The piston size mark shows on the top of the piston.
2.Set the snap ring into one side of the piston pin hole.

3.With the front mark of the connecting rod and that of the piston located on the same side, insert the piston pin.
note It is difficult to fit the piston pin into the piston when they have a different temperature, Therefore, fit the piston pin into the piston when they have the same temperature.

4.Install the shear drop side of the snap ring to the piston pin.
5.Check that the piston moves smoothly.

>>B<< OIL RING INSTALLATION



Install the expander coil and oil ring in the piston ring groove.

>>C<< PISTON RING INSTALLATION




Use a piston ring expander to install the No.1 and No.2 piston rings. The ring identification mark should face upwards.
Identification marks
    No. 1 ring: 1R
    No. 2 ring: 2R

>>D<< PISTON AND CONNECTING ROD ASSEMBLY INSTALLATION



1.Liberally coat engine oil on the circumference of the piston, piston ring, and oil ring.
2.Arrange the piston ring and oil ring gaps (side rail and spacer) as shown in the figure.
3.Rotate crankshaft so that crank pin is on centre of cylinder bore.

4.Not to damage the crank pin, attach special tool bolt guide (MB992010), to the connecting rod bolt.

5.Use suitable thread protectors on connecting rod bolts before inserting piston and connecting rod assembly into cylinder block. Care must be taken not to nick crank pin.
6.
caution Insert with the front mark on the piston head directed toward the engine front (timing belt side).
Using a suitable piston ring compressor tool, install piston and connecting rod assembly into cylinder block.

>>E<< CONNECTING ROD CAP / CONNECTING ROD CAP NUT INSTALLATION




1.Verifying the mark made during disassembly, install the bearing cap to the connecting rod. If the connecting rod is new with no index mark, make sure that the bearing locking notches come on the same side as shown.
2.The connecting rod cap bolts and nuts are tightened using the torque-to-yield method. For this reason, each bolt to be reused must be checked for elongation before installation. Whether or not the bolt has been elongated can be determined by running a nut with fingers through all the threads of the bolt. If the nut does not turn smoothly over all the threads, the bolt has been elongated and must be replaced.
3.Apply engine oil to the threads and bearing surface of each nut before installation.
4.Finger-tighten the nuts on the bolts, then tighten the nuts alternately and repeatedly to install the cap properly.
5.Tighten the nuts to a torque of 27 ± 2 N·m.

6.
caution
  • When the tightening angle is smaller than the specified tightening angle, the appropriate tightening capacity cannot be secured.
  • When the tightening angle is larger than the specified tightening angle, remove the bolt to start from the beginning again according to the procedure.
Using special tool angle gauge (MB991614), tighten the connecting rod cap nut in the illustrated sequence by a further 90° to 94°.

7.Make sure that connecting rod big end side clearance meets the specification.
Standard value: 0.10 - 0.25 mm
Limit: 0.40 mm