REMOVAL AND INSTALLATION






Removal steps


1.
Step stay


2.
Side step garnish


3.
Side step cover


4.
Side step plate




Removal steps


1.
Side step pipe


2.
Side step cover A
<<A>>
>>A<<
3.
Rivets A


4.
Side step cap
<<A>>
>>A<<
5.
Rivets B


6.
Side step plate


7.
Side step cover B

DISASSEMBLY SERVICE POINT



<<A>> RIVETS A/RIVETS B REMOVAL



Use a drill (Φ 4.0 mm) to make a hole in the rivet A and rivet B to break it, and remove the rivet.

REASSEMBLY SERVICE POINT



>>A<< RIVETS A/RIVETS B INSTALLATION



Use a rivet tool shown in the illustration to connect the parts with rivets by the following procedures.
1.Insert rivet A into the side step pipe and side step cap and rivet B into the side step pipe and side step plate.
2.Place the rivet tool over portion C of rivet.
3.While pushing the flange surface of the rivet onto parts to be fixed with the rivet tool, press the handle of the tool.
4.Thin part of portion C of the rivet will cut off and the rivet is fixed in position.