REMOVAL AND INSTALLATION





>>A<<
1.
TRITON mark (side) <Optional>

INSTALLATION SERVICE POINT



>>A<< TRITON MARK (SIDE) INSTALLATION




1.Clean the mark installation surfaces on the body with the parts cleaner (MZ100387 or equivalent).
2.
caution When attaching the marks, the ambient temperature should be 20 - 38°C and the air should be completely free of dust. If the ambient temperature is lower than 20°C, the marks and the places on the vehicle body where the marks are to be attached should be heated to 20 - 30°C.
Peel off the protection sheet on the back of the mark to paste it on the installation position.